Qingdao Lehua Technology Co., Ltd.

Lehua paint to refresh the world
Water based acrylic acid paint

Water based acrylic acid paint

Product introduction
This product consists of water soluble acrylic polymer emulsion, waterborne antirust pigments, special additives and deionized water through refined processing, has the advantages of safety, environmental protection, low temperature characteristics of good film, primer and paint into fast dry film, strong adhesion, excellent salt fog resistance, single component packaging. Convenient construction.
Use
Mainly used in machinery and equipment, building steel structure, chemical pipes, automobile chassis, automobile axle, radiator, radiator and other parts of the protective and decorative painting, is a substitute for the best upgrading of traditional solvent type light antiseptic industrial coatings. At the same time, the paint film can be matched with acrylic acid, chlorinated rubber, acrylic polyurethane and epoxy resin and other water-based products.
Product data
Primer paint
Dry time table, C = 0.5 h/25 = 0.5
Work time, h/25 is less than or equal to 24 DEG C or 80 DEG C * 20min = 24 or 80 DEG C * 30min
The adhesion level is less than or equal to 1 is less than or equal to 1
Impact resistance, CM 5050
Theoretical spreading rate, 0.25 kg/m2 (dry film thickness 50 (0.20 m) dry film thickness 50 m)
Construction technology:
1, before the construction of the bottom surface of the oil, dust, rust and other impurities should be cleaned, recommended sand or shot blasting;
2, construction before the paint mixing, coating process should be based on the requirements, plus the amount of clean tap water dilution, at a dosage of 5 ~ 10%, the recommended air spraying; spraying viscosity is generally 23 ~ 28s/ Tu -4 cup (Note: the amount of water in the wet film is dry spray, not flowing as principle. Prior to the construction of a large area, a small amount of paint can be used to carry out the coating test, the coating process, applicability, the amount of water and the wet film, dry film thickness and drying time and other parameters
3, the construction of the two recommended primer and top coat, each interval is generally 24h (25 C), a brush, a former construction should be in the film after drying;
4, is strictly prohibited contact with oily substances, while the ambient temperature is below 5 degrees C or humidity is greater than 75%, can not be constructed.
5, the end of construction, the appliance should immediately rinse with water, to prevent dry (some solid using organic solvent cleaning), the remaining paint should be kept closed, if the crust, affect the use, can use 200 mesh wire mesh filter before use.
Storage period
Should be stored at 5 to 30 degrees in the dry and ventilated place sealed preservation, storage period of 6 months.
Packing specification 20kg/ barrel
Statement: paint many factors in construction directly affects the coating effect and service life, the information and data are based on our experimental testing and actual use of the experience accumulated for the construction, when we do not understand the situation, we can only guarantee the quality of the paint. The above data are subject to change, subject to the company's latest specifications, without prior notice.